Safety and Secure Entrances

april 29, 2020

On April 28, 2020, the Rochester Public School Board approved the bids and costs for construction of the secure entry projects. The bids and costs were based off of the work in the design phases. 

During the design phases ISG Architects, Knutson Construction, Construction Services, and other facility staff met multiple times with representatives from each of the eleven (11) sites to gather input. The information was utilized along with district specifications to create the final plans. Some sites required minimal construction while others required extensive design and construction. 

More information is available on BoardDocs.

Previous Updates